May 18 - 26
Dodd Blvd to Upper 164th Street/Griffon Trail
Upper 164th Street/Griffon Trail to 160th Street
160th Street to south of 155th Street
South of 155th Street to 150th Street
- Concrete removal and paving in the median along 150th Street.
- Concrete work by the Apple Valley Transit Station.
- Milling the existing pavement along Cedar Avenue in various locations.
- Paving along Cedar Avenue.
- Continue work on the signal system at 150th Street.
150th Street to Upper 136th Street
- Mill some of the existing pavement.
- Paving along Cedar Avenue between 150th Street and 147th Street.
- Watermain and storm sewer installation along Cedar Avenue from 150th Street to 139th Street.
- Work on the retaining walls along Cedar Avenue.
- Installing the signal system interconnect.
- Work on the foundations for the signal system bases at 147th Street.
- Private utility relocation work off of the roadway along Cedar Avenue.
Schedules are subject to change due to weather and other unforeseen circumstances.