May 18 - 26
Dodd Blvd to Upper 164th Street/Griffon Trail
  • Sod installation. 
Upper 164th Street/Griffon Trail to 160th Street
  • Sod installation.  
160th Street to south of 155th Street
  • Sod installation.

South of 155th Street to 150th Street

  • Concrete removal and paving in the median along 150th Street.
  • Concrete work by the Apple Valley Transit Station.
  • Milling the existing pavement along Cedar Avenue in various locations.
  • Paving along Cedar Avenue.
  • Continue work on the signal system at 150th Street.

150th Street to Upper 136th Street

  • Mill some of the existing pavement.
  • Paving along Cedar Avenue between 150th Street and 147th Street.
  • Watermain and storm sewer installation along Cedar Avenue from 150th Street to 139th Street.
  • Work on the retaining walls along Cedar Avenue.
  • Installing the signal system interconnect.
  • Work on the foundations for the signal system bases at 147th Street.
  • Private utility relocation work off of the roadway along Cedar Avenue.


Schedules are subject to change due to weather and other unforeseen circumstances.