Oct. 31 - Nov. 8               

Trunk Highway 13
Traffic on Trunk Highway 13 is shifted to the south half of the roadway (one lane in each direction) from Washburn Avenue to approximately 1,000 feet east of the bridge over I-35W while the north half of the roadway is closed for reconstruction. The north half of the roadway will remain closed until later in the day on Friday, Nov. 7, weather permitting.

In addition, the following ramps/loops are closed until later in the day on Friday, Nov. 7, weather permitting:

  • Southbound I-35W ramp to southbound TH 13; Detour route – exit at County Road 42, go west on County Road 42 to TH 13
  • Southbound TH 13 loop to southbound I-35W; Detour route – go south on Nicollet Avenue, west on Burnsville Parkway to I-35W interchange
  • Northbound I-35W loop to southbound TH 13; Detour route – exit at Burnsville Parkway and go east, north on Nicollet Avenue to Nicollet Avenue/TH 13 intersection


Access to/from County Road 5 north of Trunk Highway 13 remains until later in the day on Friday, Nov. 7, weather permitting. Use Washburn Avenue or Cliff Road to access businesses north of Trunk Highway 13.

County Road 5
County Road 5 between Williams Drive/Greenwood Drive and Trunk Highway 13 is open to traffic along with access to/from Trunk Highway 13.

County Road 5 north of Trunk Highway 13 is closed between Trunk Highway 13 and the NE Frontage Road. Access to/from Trunk Highway 13 is closed and will continue until later in the day on Friday, Nov. 7, weather permitting. Follow the signs to access local businesses.

Business Access
Access to businesses will remain available throughout construction. However, the location of access points may change during some of the construction work. Follow the “Business Access” signs to access local businesses.

Speed limits may be reduced in the work zone. Please don’t go around barriers into construction zones.

Upcoming Access Changes
Temporary lane closures on Trunk Highway 13 will be necessary to complete remaining work, such as removing the bypasses, striping, restoration, etc., after Friday, Nov. 7. At least one lane in each direction will remain open to traffic. Please use caution when driving through the work zone.

Schedules are subject to change due to weather and other unforeseen circumstances.

Last updated: 10/31/2014 9:36 AM