County Project 23-84
Dakota County and the City of Apple Valley are improving Cedar Avenue between 138th Street and County Road 42. The roadway will be resurfaced and American with Disabilities Act (ADA) improvements will be made.
ADA improvements will include ADA accessible pedestrian ramps, detectable tactile surfaces. These are specialized textured surface that help those with limited or no vision navigate by feel using their feet or a cane.
Project timeline
May 5–July 14, 2025
Get email updates
To receive email updates for this project, email Janan Putz at janan.putz@co.dakota.mn.us. Please include “CP 23-84 Updates" in the subject line.
Access
Construction will occur in four phases:
Phase 1: Northbound outside lane and shoulder closures (about three weeks)
Phase 2: Southbound outside lane and shoulder closures (about three weeks)
Phase 3: Inside lane closures both directions (about 1.5 weeks)
Phase 4: Night milling and paving (three nights total)
Construction schedule
June 20–28
Phase 2
- Work is tentatively scheduled during the night of Friday, June 27 to the mornign of Saturday, June 28 — weather permitting
- The outside lanes will be closed in both directions for milling and paving the side street intersections
- Signal work throughout the project
- Removals and concrete installs continue
- Utility and manhole adjustments as needed