Contact
Transportation952-891-7100hwy@co.dakota.mn.us
The CSAH 31 Corridor Study identified a roadway improvement plan for the Pilot Knob Rd (CSAH 31) corridor between Central Parkway/Northwood Parkway and Yankee Doodle Road. This plan addressed existing traffic and safety concerns, such as delays, lack of available gaps to cross traffic and crash history.
Several improvement concepts for Pilot Knob Road have been developed and evaluated.
CSAH 31 Corridor Study InformationStudy OverviewProject NeedPurpose & Need ConceptsAccess ManagementPreliminary Design APreliminary Design BPreliminary Design CPreliminary Design D2030 Queuing DiagramImpact of Traffic Negotiating TurnsCSAH 31 Recommended Alternative (Shared Nov. 5, 2012)CSAH 31 Recommended Alternative (Revised Jan. 15, 2013)Pilot Knob Road Corridor Study Report (May 2013)
Last updated: 9/9/2022 3:45 PM